3604 SOUTH COOPER..ST
SUITE 100
ARLINGTON TX 76015
(682) 667-0044
Southlake Boulevard Presbyterian
Church- Southlake,
Tx.
A Phase 1 building of 10,880 sf containing a gym/ worship center with office and classroom spaces. The exterior is brick with a stone watertable. Cost of the project was about
$ 1,200,000.00 in 2001. A master plan was also developed for the church.
.
Highland Meadows Christian
Church- Colleyville, Tx.
A Phase 2 building addition of 27,600 sf containing a classroom space for all children and youth grade levels. The exterior matches the existing structure in concrete brick and champagne colored glass. Cost of the project was about $ 1,750,000.00 in 1998 .